Photo By: Kevin Morgan
 

After spotting the front half of the train at the power plant, the back half of the Valmont coal train will be placed on the Stazio Siding west of the plant. A plant switcher will pick up these loads and replace them with empties.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1986
views
0
comments
Saturday, May 15, 2010 at 2:22:59 PM
image date



Location Information
City or County and State
Boulder, CO

Subdivision
Front Range (BNSF)

Milepost or Control Point
Boulder




Train Information
Railroad
BNSF
Model
ES44AC
Unit Number
BNSF 6290



Photo Information
Camera Make/Model
Canon / Canon EOS 50D
ISO
250
Flash
Did Not Fire

Focal Length
300 mm
Shutter
1/400 seconds
Aperture
f/8


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.