Photo By: Kevin Morgan

While crews work to build a new concrete bridge as quickly as possible, UP crews prepare a section of panel track to be placed on the bridge once construction is complete.
Email Questions or Comments to the Webmaster.
User Comments (0)

No comments posted yet. Click Here to add the first one!

1385
views
0
comments
Saturday, October 22, 2005 at 3:01:20 PM
image date



Location Information
City or County and State
Rollinsville, CO

Subdivision
Moffat Tunnel (UP)

Milepost or Control Point
MP 46




Train Information
Railroad
Union Pacific
Model
None
Unit Number
None


Photo Information
Camera Make/Model
Canon / Canon EOS D60
ISO
100
Flash
Did Not Fire

Focal Length
37 mm
Shutter
1/1000 seconds
Aperture
f/4


Check out ColoradoRailfan.com on Facebook
Check out the latest ColoradoRailfan.com photos on Flickr

ColoradoRailfan.com Email Subscription
To receive updates made to ColoradoRailfan.com via Email, Click Here.

The D&RGW Site Ring
This site owned by: Kevin Morgan
Add Your Site

SiteRing by Bravenet.com

SiteRing by Bravenet.com

All content ©2000,2024 by Kevin Morgan, except where noted. Please do not use any material from this site without permission. Thank You.